The staging yard for the Oberwessel Layout circles half the basement above my work benches and then has a return loop in the furnace room. It's all hand laid track with code 83 rail and a code 40 center conductor (the visible portion of the layout will use very small etched nickel silver contact points (pukos) that are hidden the ballast. This is also going to be hand laid. I've been building my own fixtures in the mold of Tim Warris, only in wood since they don't need to last forever.
No comments:
Post a Comment